Development of a drone for management of the linear structures
Public support
Provider
Ministry of Industry and Trade
Programme
—
Call for proposals
—
Main participants
LPS, letecké práce a služby, s.r.o.
Contest type
OP - EU Operational Programme
Contract ID
MPO 16357/17/61600/833
Alternative language
Project name in Czech
Vývoj dronu pro kontrolu liniových staveb
Annotation in Czech
Předmětem projektu je výzkum a vývoj na trhu zatím nedostupného bezpilotního prostředku - dronu - se zcela unikátními parametry v podobě prodloužené doby letu a s možností startu a přistání v omezeném prostoru. Pro takto technicky koncipované zařízení pak rovněž budou řešeny odpovídající řídící a monitorovací systémy a softwarová řešení k jejich civilní aplikaci.
Scientific branches
R&D category
VV - Exeperimental development
CEP classification - main branch
JU - Aeronautics, aerodynamics, aeroplanes
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20304 - Aerospace engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
As part of the project, a prototype of a small all-composite drone with a short take-off and landing was designed and verified by flight tests. During the development of the drone, known procedures and technologies were combined with new procedures such as solving stability problems of very thin sandwiches in airframe construction, verification of computational models with low Reynolds number, verification of 3D printing technology for primary structure production, control tasks of nonlinear flight control systems, etc. . Three performance parameters were primarily monitored, which were verified for the maximum considered take-off weight: - endurance of at least 2 hours in the take-off mode, ie in the mode where it moves like an airplane - vis, time of suspension and transition from suspension to horizontal flight and back to suspension - cruising speed greater than 60 km / h
Solution timeline
Realization period - beginning
Sep 29, 2015
Realization period - end
May 12, 2021
Project status
U - Finished project
Latest support payment
Dec 9, 2017
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP22-MPO-EG-U
Data delivery date
May 24, 2022
Finance
Total approved costs
20,663 thou. CZK
Public financial support
7,589 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
3,258 thou. CZK