All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of curcuit for measurement of real ignition energy of capacitive discharge

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

  • Call for proposals

  • Main participants

    OZM Research s.r.o.

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    MPO 15582/17/61600/769

Alternative language

  • Project name in Czech

    Vývoj obvodu pro měření skutečné iniciační energie kapacitního výboje

  • Annotation in Czech

    Cílem projektu je vývoj a následná výroba prototypu měřícího obvodu, který by energii kapacitního výboje měřil bez nutnosti externích měřících, záznamových a výpočetních zařízení. Znamenalo by to zvýšení technické úrovně vyráběných přístrojů pro měření minimálních iniciačních energií hořlavých nebo výbušných látek a tedy zvýšení konkurenceschopnosti těchto přístrojů na světových trzích. Dalším cílem je snížení nároků na kvalifikaci obsluhy těchto přístrojů a její bezpečnost.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JA - Electronics and optoelectronics

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The aim of the project was the development and production of a prototype device measuring the minimum energy of an electric discharge without the need for external measuring devices, reducing the complexity and increasing the safety of the operator of the developed measuring device. The resulting prototype was integrated into two test equipment manufactured by the recipient.

Solution timeline

  • Realization period - beginning

    Sep 30, 2015

  • Realization period - end

    Aug 3, 2020

  • Project status

    U - Finished project

  • Latest support payment

    Mar 6, 2017

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP21-MPO-EG-U/01:1

  • Data delivery date

    Jun 9, 2021

Finance

  • Total approved costs

    12,197 thou. CZK

  • Public financial support

    1,936 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,123 thou. CZK