Advanced WWTP control system 4.0
Public support
Provider
Ministry of Industry and Trade
Programme
—
Call for proposals
—
Main participants
BMS SERVIS, s.r.o.
Contest type
OP - EU Operational Programme
Contract ID
MPO 76039/17/61600/3599
Alternative language
Project name in Czech
Pokročilý systém řízení ČOV 4.0
Annotation in Czech
Výstupem projektu bude realizace tří prototypů pokročilého řídicího systému ČOV (ŘS) nasazených pro tradiční i pro moderní PLC ŘS. ŘS využívá senzorové sítě se schopností virtualizace čidel, korekčních a kalibračních mechanismů. ŘS umožňuje vzdálený monitoring ČOV, jak po stránce kvality technologických dějů, tak z pohledu energetické náročnosti provozu. Vytvořený zákaznický portál pak umožňuje prezentovat výstupy formou IoT pro majitele a provozovatele infrastruktury, municipality a další.
Scientific branches
R&D category
VV - Exeperimental development
CEP classification - main branch
DJ - Pollution and water control
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10511 - Environmental sciences (social aspects to be 5.7)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The use of the system allows for appropriate application in the operation of the WWTP both to determine the energy intensity of the operation (this will be required by legislation) and as one of the operational strategies of the WWTP (minimization of energy costs) to apply during operation. The modular solution of the system and its openness enables that in the next stages of real deployment the system will be connected with gradually emerging digitized databases of detailed property records of WWTP equipment, including continuous updating of information on repairs or replacements of partial parts of WWTPs. This method will enable a permanent and continuous updating of AWCS 4.0 parameters and at the same time will significantly contribute to the optimization of the identification of the need for repairs, adjustments or reconstructions of the WWTP.
Solution timeline
Realization period - beginning
Apr 20, 2017
Realization period - end
Nov 15, 2021
Project status
U - Finished project
Latest support payment
Apr 6, 2018
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP22-MPO-EG-U
Data delivery date
Jun 30, 2022
Finance
Total approved costs
40,583 thou. CZK
Public financial support
0 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
15,430 thou. CZK