All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of emergency lighting monitoring system with serial error detection

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

  • Call for proposals

  • Main participants

    POWERBRIDGE spol. s r.o.

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    MPO 57003/18/61200/3627

Alternative language

  • Project name in Czech

    Vývoj systému monitoringu nouzového osvětlení s detekcí sériové chyby

  • Annotation in Czech

    Předložený projekt se zaměřuje na vývoj v oblasti nouzového osvětlení. Vývojový záměr cílí do oblasti monitoringu funkčnosti nouzového osvětlení a bude se snažit skloubit výhody dvou nejčastěji používaných systémů současnosti.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    AQ - Safety and health protection, safety in operating machinery

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The possibility of using monitoring modules in individual emergency lighting circuits was achieved with a significant reduction in investment intensity in comparison with addressable luminaires. There has been a major simplification of alternative power supply technologies for emergency lighting based on the uniqueness of the solution to this issue. Measurement accuracy was achieved at the level of 12-bit resolution, which means identifying a defect in the light with a power of up to 4W.

Solution timeline

  • Realization period - beginning

    Nov 28, 2017

  • Realization period - end

    Jan 15, 2021

  • Project status

    U - Finished project

  • Latest support payment

    Jun 27, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP22-MPO-EG-U

  • Data delivery date

    May 24, 2022

Finance

  • Total approved costs

    4,476 thou. CZK

  • Public financial support

    0 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,236 thou. CZK