All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Therma FM-Aplication-development of toroid core

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

  • Call for proposals

  • Main participants

    THERMA FM, s.r.o.

  • Contest type

    OP - EU Operational Programme

  • Contract ID

    MPO 59407/19/61200/973

Alternative language

  • Project name in Czech

    Therma FM-Aplikace-vývoj toroidního jádra

  • Annotation in Czech

    Cílem projektu je vyvinout toriodní jádro pro motory elektromobilů a tím řeší neexistenci vinutých toroidů z neorientované elektrooceli, které po osazení do elektromotoru rotují stejnými otáčkami jako jeho rotor.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    20301 - Mechanical engineering

  • OECD FORD - secondary branch

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JR - Other machinery industry<br>JT - Propulsion, engines and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The main goal of the project was to develop a prototype of a new generation of toroidal core, which is part of the rotor of an electric motor designed to drive cars. It is a two-rotor motor with a separate stator with axial magnetic flux, which is supplied without internal bearings between the rotors and the stator. We managed to develop and test a unique method of production from 6 mm tape while maintaining sufficient and required quality. The requirement of stable prototype production in the given dimensional tolerances with simultaneous homogeneity, rigidity and flatness of the winding was fulfilled.

Solution timeline

  • Realization period - beginning

    Dec 17, 2018

  • Realization period - end

    Sep 14, 2021

  • Project status

    U - Finished project

  • Latest support payment

    Aug 12, 2019

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP22-MPO-EG-U

  • Data delivery date

    May 24, 2022

Finance

  • Total approved costs

    8,156 thou. CZK

  • Public financial support

    0 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,315 thou. CZK