All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Device for fusing of composite materials.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 3 (SMPO200600003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM3/046

Alternative language

  • Project name in Czech

    Přístroj na tavení kompozitních materiálů.

  • Annotation in Czech

    Metoda zpracování vzorku bude určena k on-line měření a určení chemické analýzy v práškových materiálech metodou tavením do perly Je použitelná ve všech závodech na výrobu cementu, na výrobu vápna, v geologii a v hutním průmyslu, zejména pro on-line řízení výroby.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JA - Electronics and optoelectronics

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    It has been developed the method and designed the prototype system layout for the melting of composite material. It has been manufactured the functional prototype. On the prototype have been evaluated and verified the achieved results.

Solution timeline

  • Realization period - beginning

    Jan 2, 2006

  • Realization period - end

    Sep 30, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Mar 16, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MPO-FI-U/02:2

  • Data delivery date

    Apr 1, 2009

Finance

  • Total approved costs

    24,000 thou. CZK

  • Public financial support

    9,336 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    14,664 thou. CZK