All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The research and verification of the method of catalytic dehalogenation of underground water from industrial sources by bimetallic permeable reactive barriers.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 3 (SMPO200600003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM3/050

Alternative language

  • Project name in Czech

    Výzkum a ověření metod katalytické dehalogenace kontaminovaných podzemních vod z průmyslových ekologických zátěží na bimetalických permeabilních bariérách.

  • Annotation in Czech

    Výzkum je zaměřen na ověření podmínek pro praktické zavedení technologie sanací spočívajících ve využití dehalogenizace chlorovaných uhlovodíků (které patří mezi environmentálně i toxicky významné kontaminanty) v redukčním prostředí. Důraz bude kladen naalifatické chlorované uhlovodíky, ovšem laboratorní zkoušky budou provedeny i na vodě kontaminované chlorovanými pesticidy. PCB a PCDD/F.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DJ - Pollution and water control

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The most efficient catalyst proved to be the combination Fe-C/Pd, which (during 48 hours) reduced the concentration of PCBs to approximately 1% of the initial value. The efficiency was successively checked in pilot conditions.

Solution timeline

  • Realization period - beginning

    Apr 1, 2006

  • Realization period - end

    Apr 30, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Apr 29, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FI-U/02:2

  • Data delivery date

    Apr 27, 2011

Finance

  • Total approved costs

    12,239 thou. CZK

  • Public financial support

    3,000 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    9,239 thou. CZK