All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Research and verification of the method of contaminated soil remediation by the progressive technology of in situ stabilization and solidification.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 3 (SMPO200600003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM3/095

Alternative language

  • Project name in Czech

    *Výzkum a ověření metody sanace kontaminovaných zemin progresivní technologií stabilizace a solidifikace in situ.

  • Annotation in Czech

    *Výzkum a vývoj podmínek pro zavedení technologie stabilizace kontaminovaných lokalit znečištěných různými organickými a anorganickými polutanty metodou in situ. Při stabilizaci budou aplikovány kromě standardních hydraulických přísad (např. cement a vápno) také přísady se sorpčními vlastnostmi na bázi upravených hornin a přírodních materiálů (např. bentonity, zeolity), na bázi upravených odpadů (např. popílky) a specifické přísady pro imobilizaci (např. fosforečnan sodný).

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    CI - Industrial chemistry and chemical engineering

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    All axpected project of goals were actived. Project outputs will lead to introuduction in sitn soliditication/ stabilization method into practical application.

Solution timeline

  • Realization period - beginning

    May 22, 2006

  • Realization period - end

    May 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Mar 25, 2009

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP10-MPO-FI-U/02:2

  • Data delivery date

    Apr 27, 2011

Finance

  • Total approved costs

    16,066 thou. CZK

  • Public financial support

    8,800 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    7,267 thou. CZK