All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Research and development of CuSn continously cast wire production technology independence on graphite crystalizer kind and grade and their operating life.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 4 (SMPO200700003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM4/080

Alternative language

  • Project name in Czech

    *Průmyslový výzkum technologie výroby kontinuálně odlévaných drátů ze slitiny CuSn v závislosti na druhu a jakosti grafitových krystalizátorů a jejich životnosti.

  • Annotation in Czech

    *Průmyslový výzkum technologie výroby kontinuálně odlévaných drátů ze slitin CuSn a vlivu druhu a jakosti grafitových krystalizátorů na jejich kvalitu.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20306 - Audio engineering, reliability analysis<br>20501 - Materials engineering

Completed project evaluation

  • Provider evaluation

    O - Nesplněno zadání, smlouva však byla dodržena

  • Project results evaluation

    In the matter of fact the final of solving was not achieved. The suitable graphite for crystalizer was not found. Obtained valued knowledges will be used for current continuous casting. Production of wire was terminated due to econ. reasons on 1.6.08.

Solution timeline

  • Realization period - beginning

    Mar 1, 2007

  • Realization period - end

    Oct 31, 2008

  • Project status

    S - Stopped (prematurely terminated) multi-year project

  • Latest support payment

    Apr 29, 2008

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP09-MPO-FI-U/05:5

  • Data delivery date

    Apr 19, 2011

Finance

  • Total approved costs

    3,497 thou. CZK

  • Public financial support

    808 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,690 thou. CZK