All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

PETELYSE-PET recycling.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 4 (SMPO200700003)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM4/096

Alternative language

  • Project name in Czech

    PETELÝZA-Chemická recyklace PET.

  • Annotation in Czech

    Chemická recyklace PET na kyselinu tereftalovou a etylenglykol se provádí ve dvou stupních basickou glykolýzou a následnou hydrolýzou. Vzniklý hydrolyzát se pomocí elektrolýzy dělí na suspenzi kyseliny tereftalové a basický roztok glykolu. Krystalická kyselina tereftalová se oddělí ze suspenze a po promytí se suší. Etylenglykol se získává vakuovou destilací.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    CI - Industrial chemistry and chemical engineering

  • CEP - secondary branch

    DM - Solid waste and its control, recycling

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The new technological principles of chemical PET recycling was developed. The product are terephthalic acid and ethylene glycol, both are "polymer grade" quality. This technology was verified on serious apparatus. The corrosion was studied.

Solution timeline

  • Realization period - beginning

    Sep 1, 2007

  • Realization period - end

    Nov 30, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Apr 3, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FI-U/02:2

  • Data delivery date

    Apr 27, 2011

Finance

  • Total approved costs

    9,899 thou. CZK

  • Public financial support

    4,207 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,693 thou. CZK