All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Diagnostic system for Wind Turbines and Monitoring their Basic Function Reliability DSVE

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    IMPULSE

  • Call for proposals

    IMPULS 5 (SMPO20082)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FI-IM5/068

Alternative language

  • Project name in Czech

    *Diagnostický systém sledování spolehlivosti základních funkcí větrných elektráren DSVE

  • Annotation in Czech

    *Vývoj účinného diagnostického systému VE, zahrnujícího vývoj technických prostředků (HW) a soubory metod a postupů (SW) k rychlému rozpoznání a zejména predikci poruch u rozhodujících částí větrných elektráren s možností propojení s řídicím systémem VE,řídicím systémem farmy VE a dálkovou komunikací včetně přístupu TCP/IP a SCADA zobrazení.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20306 - Audio engineering, reliability analysis

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    It was developed equipment for the diag-nosis of wind power plants, including methods and operational verification. New method which is currently investigated in terms of the possibility of patent protection or other protection of the intelec. property.

Solution timeline

  • Realization period - beginning

    Mar 18, 2008

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Apr 6, 2009

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP10-MPO-FI-U/02:2

  • Data delivery date

    Apr 27, 2011

Finance

  • Total approved costs

    4,122 thou. CZK

  • Public financial support

    2,030 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,093 thou. CZK