All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research of reducing the collision consequences of railway and road vehicles and realistic verification of technologies for design of railway vehicles cabin from unconventional materials

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/113

Alternative language

  • Project name in Czech

    Výzkum snižování následků kolizí kolejových a silničních vozidel a reálné ověření technologií pro konstrukci kabin kolejových vozidel z netradičních materiálů

  • Annotation in Czech

    Projekt se zabývá výzkumem, konstrukcí a zkoušením kolejových vozidel z hlediska nekompatibilního nárazu se silničním vozidlem. Nástrojem k popisu tohoto nárazu jsou experimenty a počítačové simulace. Přední část kolejového vozidla je konstruována z netradičních materiálů. Výstupem je metodika zkoušek a konstrukce, prototyp zkušebního zařízení a doporučení pro vývoj příslušné legislativy.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    JR - Other machinery industry

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20301 - Mechanical engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The result is the real functional front part of the vail. Vehicle, certified testing meth. For this type of rail. Veh. Design, methodology for development of computational models for mathematical simul. And legislative recommendations.

Solution timeline

  • Realization period - beginning

    May 1, 2009

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Apr 4, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MPO-FR-U/02:2

  • Data delivery date

    Jul 14, 2014

Finance

  • Total approved costs

    25,943 thou. CZK

  • Public financial support

    19,270 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,673 thou. CZK