All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Complex automatization of control of autonomous powered sun shade.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/231

Alternative language

  • Project name in Czech

    Komplexní automatizace řízení autonomně napájené sluneční clony.

  • Annotation in Czech

    V rámci projektu realizovaný výzkum a vývoj si klade za cíl technickou, konstrukční a technologickou realizaci funkčního prototypu a přípravu výroby nové řady slunečních clon s motorickým ovládáním jejich funkcí. Sluneční clony mají velký vliv na tepelnou bilanci budovy vzhledem k úsporám energií a tepelné pohodě v ní nacházejících se osob. Sluneční slony mohou mít i bezpečnostní funkci.Do clon bude implementována soustava solárních fotovoltaických článků, které spolu s modulem akumulátoru/ superkapacitoru umožní trvalý energetický nezávislý provoz sluneční clony. Řídicí systém umožní realizovat funkce sluneční clony bezdrátově pomocí dálkového ovládání (jednotlivě či ve skupinách slunečních clon) a současně programem autonomně bezdrátově pomocí centrálního řídicího systému budovy.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JA - Electronics and optoelectronics

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Solution proposal of connection with central building control systems, methodology of autonomous power supply, prototype for indoor sun shade, testing system and workplace, installation of prototye for outdoor shade, protecting of intangible rights.

Solution timeline

  • Realization period - beginning

    Mar 1, 2009

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Sep 21, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FR-U/02:2

  • Data delivery date

    Apr 29, 2011

Finance

  • Total approved costs

    1,600 thou. CZK

  • Public financial support

    1,070 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    530 thou. CZK