All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research of technology treatment of Zn-Fe sludges coming from zinc chloride production

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/246

Alternative language

  • Project name in Czech

    Výzkum technologie zpracování Zn-Fe kalů z výroby chloridu zinečnatého

  • Annotation in Czech

    Zn-Fe kaly vznikající při výrobě chloridu zinečnatého (recyklací odpadní odzinkovací lázně z žárových zinkoven) jsou v současné době nezpracovatelný odpad a musí se vyvážet na skládku nebezpečných odpadů, což ohrožuje jednak životní prostředí a jednak celý systém recyklace odpadních lázní. Řešením je proto vyvinout novou technologii zpracování těchto kalů tak, aby bylo možné jejich další efektivní využití.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    There was developed a new treatment technology of waste dezincing bath from hot dip galvanizig plants to obtain iron sludges for next use. There was worked out several possibilities of next utilization of sludges.

Solution timeline

  • Realization period - beginning

    Jul 1, 2009

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    May 5, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    8,309 thou. CZK

  • Public financial support

    6,247 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,062 thou. CZK