All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Research and development for the solar panel manufacturing quality management system

Project goals

*The project is dealing with proposal, realization and verification of the 2nd generation system for the input, interoperation and output inspection in the solar panel production line. Application of new non-destructive and destructive testing methods based on pulsed optical and thermal processes is expected.

Keywords

solar power industryphotovoltaic module manufacturingnon-destructive testingmeasurement of optical and thermal processes

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/255

Alternative language

  • Project name in Czech

    *Výzkum a vývoj pro systém řízení kvality výroby solárních panelů

  • Annotation in Czech

    *Projekt je zaměřen na návrh, realizaci a ověření systému vstupní, mezioperační a výstupní kontroly II. generace pro montážní linku na výrobu solárních panelů. Předpokládá se uplatnění zejména nových metod nedestruktivního ale i destruktivního testovánízaložených na pulsních optických a tepelných procesech.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

  • 20306 - Audio engineering, reliability analysis
    20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Application of the results by PV modules manufacturers can mainly reduce the costs associated with a defective production material, reduce reject rate during the manufacturing process.In addition to the PV modules manuf. the PANEL-EL-TESTER can be used.

Solution timeline

  • Realization period - beginning

    Jun 1, 2009

  • Realization period - end

    May 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Apr 26, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    24,344 thou. CZK

  • Public financial support

    19,154 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,190 thou. CZK

Basic information

Recognised costs

24 344 CZK thou.

Public support

19 154 CZK thou.

78%


Provider

Ministry of Industry and Trade

CEP

JE - Non-nuclear power engineering, energy consumption and utilization

Solution period

01. 06. 2009 - 31. 05. 2013