All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Applied research and optimisation of production and welding of (9-12)%Cr modified steels in Czech industry.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/257

Alternative language

  • Project name in Czech

    *Aplikovaný výzkum a optimalizace výroby a svařování (9-12)%Cr modifikované ocele v podmínkách průmyslu ČR.

  • Annotation in Czech

    *Snižování exhalace emisí a růst účinnosti uhelných tepelných elektráren jsou hnací silou vývoje nových žárupevných ocelí. Pro současnou energetiku byla charakteristická teplota páry na vstupu do turbiny 540-565C. V posledních letech však dochází k růstuteplot až okolo 600C. Při srovnání dosavadních parametrů páry 540C/18 MPa lze v případě páry superkritických parametrů (610C/30 MPa) dosáhnout zvýšení účinnosti asi o 8% při snížení emisí CO2 o zhruba 20%.Řešení projektu bude zaměřeno na osvojení progresivních technologických, metalurgických a tvářecích postupů aplikačně perspektivní (9-12)%Cr ocele s cílem dosažení kvality produktů srovnatelné se zahraničím. Významným přínosem bude stanovení krátkodobých mechanických vlastností a především dlouhodobých creepových vlastností základního materiálu a svarového spoje. Stanovení těchto vlastností lze považovat za aktuální a vzhledem k vysokoteplotní aplikaci této oceli v energetických zařízení za nezbytné.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JG - Metallurgy, metal materials

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Project solution was aimed on mastering and optimisation of casting, forging and uelding advantageous (9-12)% Cr steels. Procedures for efective design of structures in power engineering also for super critical parameters of steam were determined.

Solution timeline

  • Realization period - beginning

    Mar 1, 2009

  • Realization period - end

    May 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Apr 19, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    14,215 thou. CZK

  • Public financial support

    9,035 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,181 thou. CZK