All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of technology for production of bearing outer ring of high speed rotation spindle

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/346

Alternative language

  • Project name in Czech

    Výzkum a vývoj technologie výroby vnějšího kroužku ložiska vysokoobrátkového vřetene

  • Annotation in Czech

    Výzkumem a vývojem technologie výroby kroužku ložiska vysokoobratkového vřetene dosáhnout: -zlepšení technických parametrů -snížení vyrobních nákladů -zvýšení konkurenceschopnosti -trvalý růst společnosti.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JR - Other machinery industry

  • CEP - secondary branch

    JQ - Machinery and tools

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20301 - Mechanical engineering<br>20302 - Applied mechanics<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Substitution the manufacturing of bearing rings by cold pressing is correct as well as in terms of ecology as from the point of view of significant material savings and increased productivity, while the technical parameters of the product are improved.

Solution timeline

  • Realization period - beginning

    Mar 1, 2009

  • Realization period - end

    May 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    May 10, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    14,725 thou. CZK

  • Public financial support

    5,855 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    8,869 thou. CZK