All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Integrated system for continual monitoring of choice mechanical devices in technological processes with usage acoustic emission

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/371

Alternative language

  • Project name in Czech

    *Integrovaný systém průběžného monitorování vybraných strojních uzlů a technologických procesů s využitím akustické emise

  • Annotation in Czech

    *Výzkum a ověření nových metod a vývoj systému pro diagnostiku a vyhodnocení signálů plně vzorkovaných signálů akustické emise (AE) v reálném čase.Využití signálu AE pro diagnostiku a monitorování stavu strojních součástí a technologických procesů.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Functional sample of the continuous AE analyser prototype TPL, respective SW and a certified method Identification of bearings damage initiation using AE have been created within the project. Results have been verified in industrial practice.

Solution timeline

  • Realization period - beginning

    Oct 1, 2009

  • Realization period - end

    May 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Mar 28, 2012

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    9,908 thou. CZK

  • Public financial support

    6,673 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    3,235 thou. CZK