All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimized rolling schedule - computer model for control of rolling mills

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/435

Alternative language

  • Project name in Czech

    Optimální průchodový plán počítačový model pro řízení válcovacích stolic

  • Annotation in Czech

    Předmětem projektu je vyvinutí, vytvoření a provozní ověření řídicího systému pro realizaci optimálního průchodového plánu na reverzních válcovacích tratích (stolicích) pro ploché vývalky. Předpokládané řízené parametry stolice jsou: - nastavení válcovací mezery, - nastavení protiohybových sil, - nastavení chlazení (sekčního) válců, - nastavení rychlosti válcování, - event. nastavení předního a zadního tahu na navíječkách.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JC - Computer hardware and software

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20206 - Computer hardware and architecture<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    A software for control of reversing one-stand rolling mills for flat products has been developed as a result of the project.

Solution timeline

  • Realization period - beginning

    Jun 1, 2009

  • Realization period - end

    Jun 30, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Mar 29, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    3,400 thou. CZK

  • Public financial support

    1,530 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,870 thou. CZK