All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Use of Advanced Medium and High-Alloyed Steels in Power Industry

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/492

Alternative language

  • Project name in Czech

    *Využití moderních středně a vysoce legovaných ocelí pro energetiku

  • Annotation in Czech

    *Navrhovaný projekt je zaměřen na zavedení nové slitiny do výroby a dosažení celkového zlepšení kvality výroby hmotných odlitků pro energetiku. Konsorcium řešitelských organizací se skládá ze tří společností. Koordinátorem a koncovým uživatelem výsledkůprojektu je výrobní společnost PILSEN STEEL, s.r.o. Dále je v konsorciu výzkumná firma COMTES FHT, a.s., která se zabývá se aplikovaným výzkumem a vývojem. VŠB-TU Ostrava reprezentuje základní univerzitní výzkum. V rámci projektu by se měly komplexně řešit problémy, které souvisejí s výroby odlitků z nového typu žárupevné oceli. Problémy budou řešeny s využitím aktuálních technických poznatků a nejmodernějšího vybavení.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Successfull production of medium and highalloyed steel castings, designated for different energy equipment being introduced in the practice on the bases of results in field of physical-metalurgical research, had been achieved through the project.

Solution timeline

  • Realization period - beginning

    Mar 1, 2009

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    May 30, 2011

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    36,389 thou. CZK

  • Public financial support

    24,035 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    12,355 thou. CZK