All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

SmartSwitch development and utilization of the universal architecture of safety control systems

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/545

Alternative language

  • Project name in Czech

    SmartSwitch vývoj a aplikace universální architektury zabezpečovacích zařízení

  • Annotation in Czech

    SmartSwitch je místně přestavovaná výhybka přestavníkem, která umožňuje jednak místní řízení tlačítkem a pak také dálkové řízení. Koncepce dálkového řízení musí být taková, aby byla zajištěna možnost nasazení na kolejiště nejširšího spektra provozovatelů. Výsledek řešení je pak možné aplikovat jednak na vlečky, pak také na nezabezpečené části kolejišť regionálních i celostátních drah. Systém také může být také subsystémem pro staniční zabezpečovací zařízení a umožňuje tak budování staničního zabezpečovacího zařízení etapovitě (tzn. rozložení investičních nákladů do více let).

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The result of development passed laboratory tests and tests in real environment where it was validated. It was verified that the SmartSwich device is capable to work in hard operation conditions of metalurgical plants.

Solution timeline

  • Realization period - beginning

    Mar 1, 2009

  • Realization period - end

    Jun 30, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Mar 18, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    20,318 thou. CZK

  • Public financial support

    7,100 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    13,218 thou. CZK