All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimalisation of production and operating conditions for galvanized tubes used for indoor water distribution systems

Project goals

The project is aimed to study of technological and operating factors affecting service life of galvanized steel tubes for indoor water distribution systems. At present time the very quickly degradation of galvanized tubes occurred, mainly on hot water distribution systems - the tube service life is ca 2 years. The result of project will be functional sample of hot dip galvanized tube with added value and methodology for materials selection for water distribution systems and use of galvanized materials in drinking water distribution systems.

Keywords

water distribution systemhot dip galvanized tubescorrosion damagewater quality

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 1 (SMPO2009/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI1/560

Alternative language

  • Project name in Czech

    Optimalizace výrobních a provozních podmínek žárově zinkovaných trubek pro systémy vnitřního rozvodu vody

  • Annotation in Czech

    Projekt je zaměřen na sledování technologických a provozních vlivů na životnost žárově zinkovaných trubek používaných ve vnitřních rozvodech vody. V současné době dochází především na rozvodech teplé vody k velmi rychlé degradaci povrchové úpravy a následně materiálu trubek - životnost trubek je cca 2 roky. Výstupem projektu bude funkční vzorek žárově zinkované trubky s vyšší přidanou hodnotou a metodika pro volbu materiálu pro rozvody vody a používání žárově zinkovaných povlaků v systémech rozvodu pitné vody.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JK - Corrosion and material surfaces

  • CEP - secondary branch

    JN - Civil engineering

  • CEP - another secondary branch

  • 20101 - Civil engineering
    20506 - Coating and films

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The results are the methodology of estimation of reason of galvanized tubes corrosion,the software for evaluation of suitability of galvanized tubes, the inovation of galvanising technology of tubes and the Guideline for design, control and maintenacnce.

Solution timeline

  • Realization period - beginning

    Apr 1, 2009

  • Realization period - end

    Dec 31, 2011

  • Project status

    U - Finished project

  • Latest support payment

    Jun 6, 2011

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP12-MPO-FR-U/03:3

  • Data delivery date

    Sep 11, 2012

Finance

  • Total approved costs

    3,626 thou. CZK

  • Public financial support

    2,524 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,104 thou. CZK