All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Development of a technology of heavy castings for energetics and general engineering

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 2 (SMPO2010/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI2/091

Alternative language

  • Project name in Czech

    *Vývoj technologie těžkých odlitků pro energetiku a všeobecné strojírenství.

  • Annotation in Czech

    *Studium vlivu dezoxidace, mikrolegování a sekundární metalurgie a vlastnosti kovu v odlitcích s dobou tuhnutí více než 24 hodin. Použití pokročilých systémů modelování tuhnutí, segregací, predikce slévárenských vad a napěťových polí k návrhu slévárenskétechnologie pro odlitky nad 40 t. Experimentální ověření vypočtených hodnot měřením vybraných fyzikálních veličin během odlévání a tuhnutí odlitků. Následné využití naměřených veličin k upřesnění výpočtových (simulačních) programů. Optimalizace způsobuplnění odlitků a ovlivňování teplotního pole odlitku a formy. Použití nekonvenčních postupů ovlivnění krystalizace.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    JQ - Machinery and tools

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20302 - Applied mechanics<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    New foundry technology for intensive heavy castings was tested in operational conditions. Systém of operational monitoring costs was implemented. This systém is able to collects data and important technological parameters of the productions process.

Solution timeline

  • Realization period - beginning

    Jan 1, 2010

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    May 13, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    14,051 thou. CZK

  • Public financial support

    5,849 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    8,200 thou. CZK