All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Automation of technical support processes during compressor manufacturing

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 2 (SMPO2010/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI2/206

Alternative language

  • Project name in Czech

    Automatizace procesů technické podpory výroby kompresorů

  • Annotation in Czech

    Cílem projektu Automatizace procesů technické podpory výroby kompresorů je teoreticky navrhnout a vyvinout specializovaný SW pro návrh dílů kompresoru na základě aerodynamických, pevnostních a rozměrových požadavků, jejich katalogizaci a propojení na stávající datamanagement včetně vytvoření komplexní správy dat těchto dílů s vazbou na technologické postupy a generování CAM dat. Pro dosažení optimalizace parametrů stroje je nezbytné navrhnout a vyvinout SW nástroje, které umožní realizovat proces optimalizace těchto produktů. Těmito prostředky jsou zejména parametrizace a typizace dílů kompresoru.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JQ - Machinery and tools

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20302 - Applied mechanics<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Outputs of a "software" and "publication" types are generated by the project. Duration namely of preparation and design session of the industrial compressor production has been cut. Potential mistakes related to human factor has been eliminated.

Solution timeline

  • Realization period - beginning

    Jan 1, 2010

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Mar 29, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MPO-FR-U/02:2

  • Data delivery date

    Jul 14, 2014

Finance

  • Total approved costs

    28,547 thou. CZK

  • Public financial support

    9,287 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    19,259 thou. CZK