All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of design and technology of sferical roller bearings using brass cages

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 2 (SMPO2010/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI2/240

Alternative language

  • Project name in Czech

    Výzkum a vývoj konstrukce a technologie soudečkových ložisek s využitím mosazných klecí

  • Annotation in Czech

    Výzkumem a vývojem ložisek s jednodílnou mosaznou klecí rozšířit výrobní sortiment o ložiska konkurenceschopných technických parametrů s vyšší efektivitou prodeje. Pozitivní reakce na požadavky zákazníků, kteří do náročných provozních podmínek preferujíložiska s mosaznou klecí.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JR - Other machinery industry

  • CEP - secondary branch

    JQ - Machinery and tools

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20301 - Mechanical engineering<br>20302 - Applied mechanics<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The result of the project is completed verification of developed inovative construction for technology of 50 types of spherical roller bearings with brass cage ridge EMH. The goal of the project has been achived in expecting of Spherical bearing EMH.

Solution timeline

  • Realization period - beginning

    Jan 1, 2010

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Apr 5, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    47,853 thou. CZK

  • Public financial support

    15,300 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    32,554 thou. CZK