All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Research, development and production technologies procedures verification make of new high carbon steels with specials quality needs to strenght and microcleanness intended for make steels tires cord

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 3 (SMPO2011/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI3/258

Alternative language

  • Project name in Czech

    *Výzkum, vývoj a ověření technologických postupů výroby nových vysokouhlíkových ocelí s mimořádnými požadavky na pevnost a mikročistotu určených pro výrobu ocelových kordů do pneumatik

  • Annotation in Czech

    *Projekt je zaměřen na problematiku výroby, zpracování a plynulého odlévání nových typů vysokouhlíkových ocelí primárně určených pro výrobu ocelových kordů do pneumatik. Důraz při řešení projektu bude kladen na vývoj hypereutektoidních ocelí s obsahem uhlíku nad 0,9 %, jejichž technologie výroby a odlévání je zvláště náročná zejména z hlediska potlačení až eliminace nežádoucích středových segregací a získání velmi vysoké mikročistoty s definovaným podílem netvárných vměstků. Řešení je zaměřeno na výrobutěchto ocelí od výroby v kyslíkovém konvertoru, přes sekundární metalurgii vč. struskových režimů až po možnosti zvýšení mikročistoty v podmínkách mezipánve a krystalizátoru plynulého odlévání. Součástí řešení je i vývoj nových způsobů hodnocení a identifikace nekovových vměstků v těchto ocelích.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Optimalization of the process production cord steels with improved microcleaness. Developed method of evaluation microcleanness in acids and tested detection outflow slag from ladle vibroacustic metering.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    May 30, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    14,798 thou. CZK

  • Public financial support

    7,950 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,848 thou. CZK