All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Methods of optimalisation of dose distribution calculation in the patient body during spiral tomotherapy treatment using megavoltage gamma source

Project goals

*The program project is oriented to development of methodology of assessment of absorbed dose distribution in patient body during treatment using spiral cobalt tomotherapy irradiator. The methodology automatic offers optimal treatment plan based on calculation of dose distribution meeting the limits of values for different treatment volumes. The result of project is SW module TM-Plan, too. This module is a commercial option of developing cobalt tomotherapy machine. The part of this project is validationof dose distribution using 3D gel dosimetry.

Keywords

dose assesmentdose calculationspiral tomotherapyhelical tomotherapyplanninig systemgel dosimetrydose distributiontomotherapy dosimetry

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 3 (SMPO2011/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI3/477

Alternative language

  • Project name in Czech

    *Metodika optimalizace výpočtu rozložení dávky v těle pacienta při spirálním tomografickém ozařování megavoltážním gama svazkem

  • Annotation in Czech

    *Programový projekt je zaměřen na vývoj metodiky pro stanovení rozložení absorbované dávky v těle pacienta při léčbě kobaltovým spirálním tomo-terapeutickým ozařovačem. Na základě vypočtené dávkové distribuce metodika automaticky navrhne optimální ozařovací plán při dodržení požadovaných limitních hodnot pro různé oblasti ozařovaného objemu. Projektovým výstupem je i SW modul TM-Plan, který bude komerčním doplňkem vyvíjeného kobaltového tomoterapeutického ozařovače. Součástí projektu je i ověření dávkové distribuce za pomoci třídimenzionální gelové dozimetrie.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    FS - Medical facilities, apparatus and equipment

  • CEP - secondary branch

    BA - General mathematics

  • CEP - another secondary branch

  • 10101 - Pure mathematics
    20601 - Medical engineering
    20602 - Medical laboratory technology (including laboratory samples analysis; diagnostic technologies) (Biomaterials to be 2.9 [physical characteristics of living material as related to medical implants, devices, sensors])

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    All project objectives were fulfilled, especially SW for tomotherapy treatment planning and methodology for dose distribution calculation. The results were prasented at scientific conferences. Funds were spent in accordance with the financial plan.

Solution timeline

  • Realization period - beginning

    Mar 1, 2011

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    May 15, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    16,426 thou. CZK

  • Public financial support

    9,523 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,904 thou. CZK

Basic information

Recognised costs

16 426 CZK thou.

Public support

9 523 CZK thou.

57%


Provider

Ministry of Industry and Trade

CEP

FS - Medical facilities, apparatus and equipment

Solution period

01. 03. 2011 - 31. 12. 2013