All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Engineering structure state monitoring by the means of electrically conductive elements with modified cement matrix

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 3 (SMPO2011/01)

  • Main participants

    Výzkumný ústav stavebních hmot,a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI3/485

Alternative language

  • Project name in Czech

    Sledování stavu stavebních konstrukcí pomocí elektricky vodivých prvků s modifikovanou cementovou matricí

  • Annotation in Czech

    Projekt se zabývá výzkumem kompozitních cementových materiálů na bázi anorganických složek se schopností monitorovat stavy stavebních konstrukcí, klade si za cíl vytvoření uceleného systému, který bude tvořen kompozitním cementovým materiálem a vyhodnocovací autonomní jednotkou. Jedním z cílů projektu je využití obnovitelných zdrojů. Součástí projektu je i vyřešení odpovídajících elektronických systémů způsobilých snímat, vyhodnocovat, registrovat či dále přenášet elektrické signály podle požadavků.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JI - Composite materials

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    In the scope of this project there was designed a composite material based on inorganic compounds, which is able to response to a change of loading by a change of electrical parameters. These parameters could be monitored with a designed system.

Solution timeline

  • Realization period - beginning

    Mar 11, 2011

  • Realization period - end

    May 30, 2015

  • Project status

    U - Finished project

  • Latest support payment

    Mar 24, 2014

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP16-MPO-FR-U/02:1

  • Data delivery date

    Feb 13, 2018

Finance

  • Total approved costs

    40,007 thou. CZK

  • Public financial support

    31,800 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    8,207 thou. CZK