All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Research and development of black powder testing methods for small arms usage

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 4 (SMPO2012/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI4/288

Alternative language

  • Project name in Czech

    *Výzkum a vývoj metod zkoušení černého prachu pro účely použití v ručních palných zbraních

  • Annotation in Czech

    *Cílem projektu je vytvoření metody stanovení výkonu černého prachu jako hnací náplně ve střelivu pro ruční palné zbraně, která doposud chybí v předpisech pro zkoušení C.I.P. (Mezinárodní stálá komise pro zkoušení ručních palných zbraní pro civilní potřebu). Princip navrženého řešení spočívá ve stanovení optimální prachové náplně a balistických parametrů černých prachů (v současnosti dostupných na trhu) v balistickém měřidle ráže .44 Remington Magnum a následném aplikování této metody na černé prachy vyráběné firmou Explosia.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JY - Firearms, ammunition, explosives, combat vehicles

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>21100 - Other engineering and technologies

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Within the frame of this project two new products - Vesuvit LC-1 a Vesuvit LC-2 were developer, manufacturing technology of this products was homologated, new certified proof method of black powder was developed and incorporated to standards ČSN.

Solution timeline

  • Realization period - beginning

    Jan 1, 2012

  • Realization period - end

    Dec 31, 2014

  • Project status

    U - Finished project

  • Latest support payment

    Apr 22, 2014

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP15-MPO-FR-U/01:1

  • Data delivery date

    Jul 3, 2015

Finance

  • Total approved costs

    3,727 thou. CZK

  • Public financial support

    2,082 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,646 thou. CZK