All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Development of New Technology of Repair Welding for Operated Reactor Pressure Vessel WWER 1000

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 4 (SMPO2012/01)

  • Main participants

    ŠKODA JS a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI4/509

Alternative language

  • Project name in Czech

    Vývoj nové technologie opravného svařování provozovaných tlakových nádob jaderných reaktorů VVER 1000

  • Annotation in Czech

    Předmětem řešení projektu je výzkum, vývoj a uplatnění nových metod opravného svařování TNR VVER 1000 s využitím vysokoniklových přídavných materiálů na bázi INCONEL FM 52 ve spojení se svařováním s využitím metody GTAW a svařovacího robota. Cílem je zajištění požadovaných parametrů opravného svaru ve stěně TNR VVER 1000 z hlediska provozní bezpečnosti a zbytkové životnosti a kvalifikace metody a přídavného materiálu pro opravné svařování na základě vyhovujících experimenty podložených výsledků.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JF - Nuclear energy

  • CEP - secondary branch

    JG - Metallurgy, metal materials

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20305 - Nuclear related engineering; (nuclear physics to be 1.3);<br>20501 - Materials engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The main benefit is the expansion of the range of repair services for VVER reactors. The solution of this project has enabled us to have a technology that corresponds to today's technical possibilities and requirements of the NPP operator on the readiness to repair, its rapid and high quality implementation with respect to the requirements of radiation protection.

Solution timeline

  • Realization period - beginning

    Jun 1, 2012

  • Realization period - end

    Jun 30, 2016

  • Project status

    U - Finished project

  • Latest support payment

    May 21, 2015

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP17-MPO-FR-U/03:1

  • Data delivery date

    Feb 12, 2018

Finance

  • Total approved costs

    69,774 thou. CZK

  • Public financial support

    38,900 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    30,874 thou. CZK