All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Integrated Bed System for Bariatric Patients

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TIP

  • Call for proposals

    TIP 4 (SMPO2012/01)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FR-TI4/787

Alternative language

  • Project name in Czech

    *Integrovaný lůžkový systém pro bariatrické pacienty

  • Annotation in Czech

    *Cílem projektu je vývoj nového produktu společnosti LINET, který by byl úspěšně umístěn na trh. Jedná se o inteligentní lůžko a antidekubitní matraci pro bariatrické pacienty. Budou vyvinuty dvě varianty řešení pro nemocniční péči, které budou zaručovatbezpečnost jak pacienta, tak ošetřujícího personálu, a to na nejmodernější technologické úrovni. Projekt reaguje na neustále stoupající počet silně obézních pacientů a nové nároky, které jsou tím kladeny na trh zdravotnických potřeb. V rámci projektu bude vyvíjeno řešení pro akutní zdravotnickou péči, které bude zahrnovat i funkcionality tzv. inteligentního lůžka. Postup řešení a výsledky projektu: a) specifikace zadání výzkumu a vývoje, b) vytvoření celkové koncepce produktu, c) vývoj dílčích funkcionalit, jejich ověření, d) výroba prototypu.Oproti konkurenčním produktům bude nově vyvíjené řešení zahrnovat celou řadu inovativních funkcionalit (např. integrovaný antidekubitní systém, ERM - Electronic Medical Record aj.).

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    FS - Medical facilities, apparatus and equipment

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20601 - Medical engineering<br>20602 - Medical laboratory technology (including laboratory samples analysis; diagnostic technologies) (Biomaterials to be 2.9 [physical characteristics of living material as related to medical implants, devices, sensors])

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Within the project a hospital bed for bariatric patients and active anti-pressure shore mattress for the same target group vere developed. The objectives of the project were fulfilled. The results of the project are innovative internationally.

Solution timeline

  • Realization period - beginning

    Jan 1, 2012

  • Realization period - end

    Dec 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Apr 23, 2013

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP14-MPO-FR-U/02:2

  • Data delivery date

    Jul 17, 2014

Finance

  • Total approved costs

    12,181 thou. CZK

  • Public financial support

    4,228 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    7,952 thou. CZK