All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research of new cement binders with an optimized content of non-traditional raw materials.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 1 (SMPO200400002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA/020

Alternative language

  • Project name in Czech

    Výzkum nových cementových pojiv s optimalizovaným obsahem netradičních surovin.

  • Annotation in Czech

    Projekt je zaměřen na přípravu nových ekonomicky a ekologicky příznivých cementových pojiv s využitím netradičních surovin. Přitom bude probíhat i komplexní posouzení jednotlivých vytipovaných surovin z hlediska jejich vhodnosti použití v jednotlivých fázích výroby portlandského cementu a navržen způsob hodnocení těchto surovin pro jejich uplatnění v cementářském průmyslu a jejich optimální využívání.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    JI - Composite materials

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The main result od project solution was to give an entry of a certificate of utility model for 3 types of blended cement based on Portland cement clinker, which show better technological properties than standard PC when replacement level is 20 wt.%.

Solution timeline

  • Realization period - beginning

    Aug 1, 2004

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Apr 16, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MPO-FT-U/01:1

  • Data delivery date

    Jun 20, 2008

Finance

  • Total approved costs

    13,117 thou. CZK

  • Public financial support

    8,639 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,478 thou. CZK