All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*New procedures for an operation of industrial trickle bed reactors - intensification and safety control.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 1 (SMPO200400002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA/039

Alternative language

  • Project name in Czech

    *Nové metody provozování průmyslových zkrápěných reaktorů - intenzifikace a bezpečné řízení.

  • Annotation in Czech

    *Vývoj znalostní báze a metodiky pro intenzifikaci a bezpečné provozování průmyslových zkrápěných reaktorů, propojením teoretických a praktických znalostí výzkumných pracovišť chemického průmyslu a vědecké základny. Výstupem projektu bude souhrn poznatkůpro provozování průmyslových zkrápěných reaktorů opírající se o experimentální měření na aparatuře v poloprovozním měřítku a výsledků řešení matematického modelování.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    CI - Industrial chemistry and chemical engineering

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    We have achieved objectives of the project that was focused on the new methods of operation of industrial trinkl-bed reactors. New production technology was verified in a pilot plant and increase of reaction conversion by 15 to 20% was proved.

Solution timeline

  • Realization period - beginning

    May 1, 2004

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Mar 19, 2007

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP08-MPO-FT-U/01:1

  • Data delivery date

    Jun 20, 2008

Finance

  • Total approved costs

    20,305 thou. CZK

  • Public financial support

    17,666 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,640 thou. CZK