All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimalization of complex technology for remedial works on landslides mainly in areas with energetic activity.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 1 (SMPO200400002)

  • Main participants

    SG Geotechnika a.s.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Optimalizace komplexní technologie sanace sesuvů zejména v oblasti s energetickou činností.

  • Annotation in Czech

    Cílem projektu je metodicky řešit stabilitní problémy na územícj postižených hornickou činností. Problematika je rozdělena do etap: klasifikace sesuvů a přesné definování jednotlivých typů sesuvů, inženýrsko geologický, geotechnický a hydrologický

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Acceptable

Solution timeline

  • Realization period - beginning

    Jan 1, 2004

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-MPO-FT-U/02:2

  • Data delivery date

    Feb 19, 2007

Finance

  • Total approved costs

    15,106 thou. CZK

  • Public financial support

    7,500 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    7,607 thou. CZK