All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Nuclear transmutation system SPHINX (Spent Hot fuel Incinerator by Neutron fluX) with molten fluoride salts based liquid nuclear fuel.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 1 (SMPO200400002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA/055

Alternative language

  • Project name in Czech

    Jaderný transmutační systém SPHINX s kapalným jaderným palivem na bázi roztavených fluoridů.

  • Annotation in Czech

    Výzkumné práce vedoucí k návrhu jaderného transmutačního systému založeného na použití roztavených fluoridových solí jako kapalného jaderného paliva. Důležitým úkolem je optimalizovat schopnost transmutoru efektivně jaderně spalovat (tj. štěpit) aktinidyz vyhořelého jaderného paliva ze stávajících jaderných energetických reaktorů a transmutovat dlouhodobé radionuklidy na izotopy krátkodobé, resp. stabilní.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JF - Nuclear energy

  • CEP - secondary branch

    DL - Nuclear waste, radioactive pollution and control

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20305 - Nuclear related engineering; (nuclear physics to be 1.3);

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Experimental verifications of design inputs for transmutation system SPHINX have been performed. Nuclear burner of transuranium and transmutation of fission products from the VVER spent fuel, as well as thorium breeder versions have been evaluated.

Solution timeline

  • Realization period - beginning

    Sep 1, 2004

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Nov 25, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-FT-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    128,126 thou. CZK

  • Public financial support

    75,547 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    52,579 thou. CZK