All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Method for determination of residual life of pressure componenets operated on thermal power plants at under-creep area.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 2 (SMPO200500008)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA2/028

Alternative language

  • Project name in Czech

    Metodika stanovení zbytkové životnosti tlakových zařízení pracujících na klasických elektrárnách v podcreepové oblasti.

  • Annotation in Czech

    Metodika stanovení zbytkové životnosti tlakových zařízení pracujících na klasických elektrárnách v podcreepové oblasti.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JS - Reliability and quality management, industrial testing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20306 - Audio engineering, reliability analysis<br>20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The procedure on gradual fatigue damage of material of dynamic loaded component by the DIALIFE system was proposed and verified. Probability approach for risk determination of assessed components was applied.

Solution timeline

  • Realization period - beginning

    Jan 23, 2005

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Apr 20, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MPO-FT-U/01:1

  • Data delivery date

    Jun 20, 2008

Finance

  • Total approved costs

    26,959 thou. CZK

  • Public financial support

    17,490 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    9,467 thou. CZK