All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Biomass gasification for cogeneration.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 2 (SMPO200500008)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA2/061

Alternative language

  • Project name in Czech

    Kogenerace se zplyňováním biomasy.

  • Annotation in Czech

    Projekt je zaměřen na problematiku výroby plynu z biomasy a na decentralizovanou energetiku využívající energetický potenciál plynu ke kogenerované výrobě elektrické a tepelné energie.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

    JP - Industrial processes and processing

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20501 - Materials engineering<br>20704 - Energy and fuels<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Benefit: gas generator is filled from the bottom. Advantages: process of gasification could be continuosly controled and the quality of the gas is the same it is not necessary to open the storage tank for the top filling. Indicate in areas with biomass.

Solution timeline

  • Realization period - beginning

    Jun 1, 2005

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Jun 13, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FT-U/01:1

  • Data delivery date

    Jun 21, 2010

Finance

  • Total approved costs

    39,438 thou. CZK

  • Public financial support

    26,030 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    13,410 thou. CZK