All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Modified calcium sulfate hemihydrates with exceptional utility properties.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/005

Alternative language

  • Project name in Czech

    Modifikované hemihydráty síranu vápenatého s výjimečnými užitnými vlastnostmi.

  • Annotation in Czech

    Řešení problému modifikací hemihydrátu sírranu vápenatého, jejichž hydratací vzniknou produkty výjimečných mechanických vlastností a výjimečných přenosových parametrů vlhkosti a tepla. Hlavním účelem a smyslem těchto modifikací je dosažení výjimečných užitných vlastností umožňujících výrazné rozšíření možností jejich využití, zejména ve stavebním průmyslu ve formě prvků nosných konstrukcí staveb a tepelně a zvukově izolačních prvků.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    CA - Inorganic chemistry

  • CEP - secondary branch

    JN - Civil engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10402 - Inorganic and nuclear chemistry<br>20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Material was used in the development of the following applications, namely: construction blocks load bearing and non-load bearing walls, heat insulating, non combustible, flame proof material, material for building blocks for reduction of X-ray radiation

Solution timeline

  • Realization period - beginning

    Jan 18, 2006

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Apr 23, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FT-U/01:1

  • Data delivery date

    Jun 21, 2010

Finance

  • Total approved costs

    22,210 thou. CZK

  • Public financial support

    11,580 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    10,630 thou. CZK