All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Minimising the quantity of nutriens and wastewater discharged into surface water and groundwater - procedures and equipment.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/012

Alternative language

  • Project name in Czech

    Minimalizace množství nutrientů a odpadních vod vypouštěných do vod povrchových a podzemních - postupy a zařízení.

  • Annotation in Czech

    Vývoj zařízení a technologií umožňujících snížení množství vypouštěných odpadních vod a nutrientů do podzimních a povrchových vod. Vývoj a ověření těchto technologií je nutným předpokladem pro reálné věcné i ekonomické řešení zpřísněných požadavků ze strany vodohospodářských orgánů. Prakticky jde o vývoj vhodných technologií pro řešení čištění odpadních vod z horských chat, rekreačních objektů, apod. a pro objekty v oblastech s nedostatkem vody (Afrika, Středozemní moře, Blízký východ).

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    DJ - Pollution and water control

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The system of the nutrient amount minimalization was created and following production were produced: tank for urine separation AS-STAB and small WWTP with system AS-VARIO comp ultra.

Solution timeline

  • Realization period - beginning

    Mar 1, 2006

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Apr 29, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-FT-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    3,253 thou. CZK

  • Public financial support

    1,350 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,903 thou. CZK