All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Intensification of biological treatment plant of waste water.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/049

Alternative language

  • Project name in Czech

    Intenzifikace biologické čistírny odpadních vod.

  • Annotation in Czech

    Výzkum techniky tlakové oxidace a určení účinného katalytického systému pro předúpravu odpadních vod Aliachem a.s. Výzkum spojení membránových operací a bioreaktoru. Výzkum podpůrných analyticko-toxikologických metod. Laboratorní a pilotní výzkum, inženýring.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    DJ - Pollution and water control

  • CEP - secondary branch

    CI - Industrial chemistry and chemical engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Result of this project is catalytic pressure oxidation management. The suitable catalyst was chosen for Aliachem a.s. wastewater disposal. Microfiltration for activated sludge separation is viable and it is possible to use this method.

Solution timeline

  • Realization period - beginning

    Jan 12, 2006

  • Realization period - end

    Dec 31, 2007

  • Project status

    U - Finished project

  • Latest support payment

    Mar 30, 2007

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP08-MPO-FT-U/01:1

  • Data delivery date

    Jun 20, 2008

Finance

  • Total approved costs

    8,924 thou. CZK

  • Public financial support

    4,116 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,808 thou. CZK