All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of new tunneling technology in underground works in extreme contitions of sity saturated soil with water under pressure.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/113

Alternative language

  • Project name in Czech

    Výzkum a vývoj nové bezpečné technologie ražení podzemních děl v extrémních podmínkách prachovitých zvodnělých zemin s tlakovou vodou.

  • Annotation in Czech

    Vývoj nové metody ražení podzemních děl v extrémních podmínkách prachovitých zvodnělých zemin. Metoda umožní eliminovat nebezpečí průvalů vody a zvodnělých bahnin do prostoru raženého důlního díla, které ve stávajících podmínkách znamená potenciální nebezpečí pro další postup stavby důlního díla a vlastní ražby a tím znemožňuje otvírku nových geologických bloků vyhrazeného nerostu.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    DH - Mining industry including coal mining and processing

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering<br>20701 - Environmental and geological engineering, geotechnics<br>20702 - Petroleum engineering (fuel, oils)<br>20703 - Mining and mineral processing

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Development of a new technology for securing the passing of the dangerous hydro geological sections of the mining works.

Solution timeline

  • Realization period - beginning

    Mar 1, 2006

  • Realization period - end

    Apr 30, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Aug 26, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MPO-FT-U/01:1

  • Data delivery date

    Jun 21, 2010

Finance

  • Total approved costs

    8,673 thou. CZK

  • Public financial support

    2,111 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,562 thou. CZK