All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

*Development of a small wastewater treatment plant with sludge separation by means of submerged membrane modul.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/123

Alternative language

  • Project name in Czech

    *Vývoj malé čistírny odpadních vod se separací kalu ponořeným membránovým modulem.

  • Annotation in Czech

    *Vývoj aktivační čistírny odpadních vod s ponořenými membránami využitelnými pro čištění odpadních vod z malých zdrojů znečištění. Technologie čištění odpadních vod využívající ponořené membrány pro separaci aktivovaného kalu od vyčištěné vody se vyznačují vysokou kvalitou odtoku včetně zajištění hygienizace vody, tj. odstranění virů a bakterií. Projekt se bude zabývat výběrem materiálu membrán, ověření jejich propustnosti, způsobu provozu a jejich praní a regenerace.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    DJ - Pollution and water control

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20101 - Civil engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project result is prototype of MBR WWTP with flat sheet polymer membrane which was tested in a real situation. Another one is tested in VÚV T.G.M. and it´s almost ready for CE.

Solution timeline

  • Realization period - beginning

    May 24, 2006

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    Mar 27, 2009

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP10-MPO-FT-U/01:1

  • Data delivery date

    Jun 21, 2010

Finance

  • Total approved costs

    2,879 thou. CZK

  • Public financial support

    1,249 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,632 thou. CZK