All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and development of mechanical equipment for controlled ozone degradation of tyre-rubber.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/130

Alternative language

  • Project name in Czech

    Výzkum a vývoj strojního zařízení pro ozónovou degradaci pryže z pneumatik.

  • Annotation in Czech

    Výzkum a vývoj podmínek procesu fyzikálně-chemické degradace různých druhů pryže obsažené v pneumatikách o velikosti do 24". Cílem je získání využitelných surovin. Zhotovení a provoz na základě vyzkoumaných podmínek procesu likvidace pneumatik v linkáchřízené ozónové degradace pryže pneumatik.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Result of the project is the design and making of a testing station for ozone destruction of rubber from tyres. The testing station is functional; we recommend further development with the aim of production equipment.

Solution timeline

  • Realization period - beginning

    Feb 24, 2006

  • Realization period - end

    Aug 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Mar 31, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-FT-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    10,900 thou. CZK

  • Public financial support

    4,137 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,763 thou. CZK