All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
FV10065

Development of the intermediate level for the upgrade of system of radiation monitoring SEJVAL

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TRIO

  • Call for proposals

    TRIO 1 (SMPO201600001)

  • Main participants

    VF, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    2016FV10065

Alternative language

  • Project name in Czech

    Vývoj střední úrovně pro náhradu systému radiační kontroly SEJVAL

  • Annotation in Czech

    Cílem projektu je návrh, vývoj, výroba a odzkoušení funkčního vzorku zařízení, které v celém rozsahu nahradí existující střední úroveň centralizovaného systému radiační kontroly SEJVAL a doplní tak výrobní portfolio společnosti VF, a.s. Splněním tohoto cíle se dosáhne unifikace radiačního monitorovacího systému. Zařízení bude využito v oblasti jaderné energetiky, průmyslu a zdravotnictví.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JF - Nuclear energy

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20305 - Nuclear related engineering; (nuclear physics to be 1.3);

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project has achieved the set objectives and outputs of the project. The result of the project are input and output modules for communication with radiation control detectors of the centralized system with lower/upper level radiation monitoring system, power supply module, signaling module, input and output module for communication with telemetry system, power supply module.

Solution timeline

  • Realization period - beginning

    Aug 1, 2016

  • Realization period - end

    Dec 31, 2018

  • Project status

    U - Finished project

  • Latest support payment

    Apr 13, 2018

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP19-MPO-FV-U

  • Data delivery date

    Apr 11, 2024

Finance

  • Total approved costs

    23,263 thou. CZK

  • Public financial support

    13,375 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,008 thou. CZK