All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
FV30072

Effective optimization of cement-bonded particleboards production waste utilization for manufacturing new competitive building materials

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TRIO

  • Call for proposals

    TRIO 3 (SMPO201800001)

  • Main participants

    CIDEM Hranice, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    2018FV30072

Alternative language

  • Project name in Czech

    Efektivní optimalizace využití odpadu z produkce cementotřískových desek pro výrobu konkurenceschopných stavebnin

  • Annotation in Czech

    Záměrem projektu je výzkum a vývoj konkurenceschopných stavebních materiálů při efektivním využití odpadu z výroby cementotřískových desek. Odpad je produkován spol. CIDEM Hranice, a.s. v množství cca 12 000 t/rok a dále ukládán na skládku, což zatěžuje životní prostředí a zvyšuje náklady společnosti. Z hlediska složení představuje odpad z výroby cementotřískových desek potenciální alternativní surovinu pro uplatnění ve výrobcích nových užitných vlastností. Pozornost bude částečně zaměřena i na jiné alternativní suroviny (teplárenská škvára, jemně mletý vápenec atd.). Cílem vývoje jsou tři typů materiálů – podsypy podlah, stabilizace zemního podloží a cementotřískové desky. Nový podsyp podlah bude převážně tvořen vhodně optimalizovaným odpadem z výroby cementotřískových desek. Pro stabilizaci zemního podloží budou využity pouze jemnější podíly odpadu s dominantním obsahem cementové matrice. V případě desek bude cílem aplikace veškerých složek výše uvedeného odpadu. Při vývoji budou využity nejmodernější unikátní přístrojové techniky a pokročilé metodiky. Tak bude možné porozumět vztahům mezi složením, mikrostrukturou a technickými vlastnostmi daného materiálu s následnou optimalizací chování a vlastnosti vyvíjených materiálů z hlediska bezproblémového uvedení na tuzemský i zahraniční trh. Řešení projektu výrazně přispěje i k efektivnímu využívání zdrojů vč. technologických změn a omezení spotřeby materiálů s vysokými energetickými nároky. Mezi předpokládané výsledky řešení projektu patří 6 funkčních vzorků (podsyp podlah, stabilizace zemního podloží a 4 typy cementotřískové desky) a užitný vzor (cementotřísková deska specifického složení a vlastností).

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20101 - Civil engineering

  • OECD FORD - secondary branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • OECD FORD - another secondary branch

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    DI - Pollution and air control<br>DJ - Pollution and water control<br>DK - Contamination and decontamination of soil including pesticides<br>DL - Nuclear waste, radioactive pollution and control<br>DM - Solid waste and its control, recycling<br>DO - Protection of landscape<br>JN - Civil engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project has achieved the set objectives and outputs of the project. As a result of the project, the following building materials have been developed: Cement particle board containing a higher amount of treated waste from the production of these boards, sub-base for dry floors with a high content of waste from the production of cement particle board, material for stabilized embankments and backfill in road construction containing waste from the production of cement particle board, cement-bonded particleboard with a matrix based on alternative raw materials characterised by a rapid increase in strength, cement-bonded particleboard with a binder containing an increased amount of alternative raw materials, cement-bonded particleboard with a filler optimised by the application of optimised waste from the production of these boards, cement-bonded particleboard with a modified matrix and filler by the application of optimised waste from the production of these boards.

Solution timeline

  • Realization period - beginning

    Jan 1, 2018

  • Realization period - end

    Dec 31, 2021

  • Project status

    U - Finished project

  • Latest support payment

    Mar 25, 2021

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP22-MPO-FV-U

  • Data delivery date

    Apr 15, 2024

Finance

  • Total approved costs

    17,679 thou. CZK

  • Public financial support

    12,316 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,408 thou. CZK