Innovation of the production technology of lightened brick body for thin-walled brick blocks
Project goals
The main objective of the proposed project is improvement of technology solution of the lightened brick body for thin-walled brick blocks on the basis of the achievement of deeper knowledge on the relation between its microstructure and utility properties. The following sub-objectives are necessary to be met prior to the main objective: 1. An analysis of the composition and properties of the raw material depending on the position in the location, 2. a detailed determination of basic physical, mechanical, thermal and hygric properties of the brick body in dependence on temperature and time of burning, 3. an improvement of the drying process of the raw material, 4. an optimization of the energetic and economic demands of the burning process in the operating conditions.
Keywords
Brick bodythin-walled brick blockexperimental analysiscomputational simulationseconomical optimalizationcompetitiveness
Public support
Provider
Ministry of Industry and Trade
Programme
TRIO
Call for proposals
TRIO 4 (SMPO201900001)
Main participants
HELUZ cihlářský průmysl v.o.s.
Contest type
VS - Public tender
Contract ID
2019FV40007
Alternative language
Project name in Czech
Inovace technologie výroby lehčeného cihelného střepu pro tenkostěnné cihelné bloky
Annotation in Czech
Hlavním cílem projektu je zdokonalení technologického řešení výroby lehčeného cihelného střepu pro tenkostěnné cihelné bloky na základě prohloubení poznatků o vztahu mezi jeho mikrostrukturou a užitnými vlastnostmi. Pro splnění tohoto cíle je nezbytná realizace následujících dílčích cílů: 1. analýza složení a vlastností suroviny v závislosti na poloze v nalezišti- 2. detailní stanovení fyzikálních, mechanických, tepelných a vlhkostních vlastností cihelného střepu v závislosti na teplotě výpalu a době výpalu- 3. zdokonalení procesu sušení suroviny- 4. optimalizace energetické a ekonomické náročnosti výpalu v provozních podmínkách.
Scientific branches
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The project has achieved the set objectives and outputs of the project. The result of the project is a proven technology for the production of brick shards with reduced energy consumption and associated reduced CO2 production.
Solution timeline
Realization period - beginning
Jul 1, 2019
Realization period - end
Dec 31, 2022
Project status
U - Finished project
Latest support payment
Mar 19, 2021
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP23-MPO-FV-U
Data delivery date
Jun 28, 2023
Finance
Total approved costs
17,755 thou. CZK
Public financial support
9,935 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
6,300 thou. CZK
Basic information
Recognised costs
17 755 CZK thou.
Public support
9 935 CZK thou.
55%
Provider
Ministry of Industry and Trade
OECD FORD
Civil engineering
Solution period
01. 07. 2019 - 31. 12. 2022