All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Optimization of real-time custom piece production management using IoT and digital technologies

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

    —

  • Call for proposals

    TREND 1 (STA02019FW010)

  • Main participants

    VUSTE-APIS, s.r.o.

  • Contest type

    VS - Public tender

  • Contract ID

    FW01010460 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Optimalizace řízení zakázkové kusové výroby v reálném čase využitím IoT a digitálních technologií

  • Annotation in Czech

    Základním cílem projektu je VaV a ověření (pilotní aplikace) unikátního, opakovaně aplikovatelného systému optimalizace technologie řízení zakázkové kusové výroby v reálném čase, využívající zpracování VK dat – (big dat vznikajících na jednotlivých výrobních úsecích, zpracovávaných – s využitím umělé inteligence a principů Průmysl. 4.0 - optimalizovaných pro následná rozhodování v řízení výroby s využitím ICT). Výsledkem bude zvýšení flexibility řízení zakázkové výroby a žádoucí pružná reakce na potřeby zákazníků ., Výsledný Nový systém povede k celkovému zvýšení mezinárodní konkurenceschopnosti, uplatnění na trhu eurozóny a ke zvýšení celkové efektivnosti zakázkové kusové výroby i její technické přípravy

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20301 - Mechanical engineering

  • OECD FORD - secondary branch

    20501 - Materials engineering

  • OECD FORD - another secondary branch

    20205 - Automation and control systems

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    JD - Use of computers, robotics and its application<br>JG - Metallurgy, metal materials<br>JP - Industrial processes and processing<br>JR - Other machinery industry<br>JT - Propulsion, engines and fuels

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project met its set objectives, and the planned outputs were produced. The results have practical applicability, with the actual extent of implementation depending on the product's success in a competitive environment. The required functions of the ZKV control system—including the user interface—were tested using the ŘZKV software modules, and data interfaces between production control and the ERP system were verified during pilot operation using real-world data.

Solution timeline

  • Realization period - beginning

    Jan 1, 2020

  • Realization period - end

    Jun 30, 2023

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2023

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP24-TA0-FW-U

  • Data delivery date

    Aug 18, 2026

Finance

  • Total approved costs

    17,993 thou. CZK

  • Public financial support

    12,595 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    5,399 thou. CZK