Development of a new series of welded gate valves for industry, energy and design of production technology using the principles of Industry 4.0
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
TREND 3 (STA02020FW030)
Main participants
ARMATURY Group a.s.
Contest type
VS - Public tender
Contract ID
FW03010587 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Vývoj nové řady svařovaných šoupátek pro průmysl, energetiku a návrh technologie výroby s využitím principů Průmyslu 4.0
Annotation in Czech
Cílem projektu je: - vyvinout novou řadu armatur koncipovaných jako svařenec - unifikovat rozměrové řady, zjednodušit dokumentaci, snížit náklady na výrobu a zkrátit dobu výroby - zajistit soběstačnost a zvýšit bezpečnost v oblasti dodávek armatur pro energetiku, zejména jadernou - zbavit se závislosti na dodávkách odlitků z Číny a jiných mimo evropských zemí - vrátit know-how zpět do ČR potažmo EU
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
20301 - Mechanical engineering
OECD FORD - secondary branch
20204 - Robotics and automatic control
OECD FORD - another secondary branch
20501 - Materials engineering
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JD - Use of computers, robotics and its application<br>JG - Metallurgy, metal materials<br>JP - Industrial processes and processing<br>JR - Other machinery industry<br>JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
V - Vynikající výsledky projektu (s mezinárodním významem atd.)
Project results evaluation
The project was executed to a high standard, in accordance with the plan, the provider's requirements, and the program's objectives. The recipient submitted all required documentation in full and without deficiencies. All planned objectives and results were achieved, with many exceeding initial expectations. The project delivered tangible outputs with significant practical applicability—valve prototypes, validated manufacturing technologies, a pilot production line featuring a digital twin, and utility model protection for the solutions developed. The proposed solutions address current industrial needs regarding self-sufficiency, automation, and manufacturing flexibility. Funds were utilized purposefully and efficiently, with total costs commensurate with the scope and quality of the results achieved. Based on the foregoing, the review committee concludes that the project was successfully completed with outstanding results.
Solution timeline
Realization period - beginning
Jan 1, 2021
Realization period - end
Dec 31, 2024
Project status
U - Finished project
Latest support payment
Feb 28, 2024
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP25-TA0-FW-U
Data delivery date
Jul 20, 2026
Finance
Total approved costs
28,969 thou. CZK
Public financial support
18,133 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
10,760 thou. CZK