Fiber delay line for interferometer
Public support
Provider
Technology Agency of the Czech Republic
Programme
—
Call for proposals
TREND 4 (STA02021FW040)
Main participants
OptiXs, s.r.o.
Contest type
VS - Public tender
Contract ID
FW04020047 - Smlouva o poskytnutí podpory
Alternative language
Project name in Czech
Vláknová zpožďovací linka pro interferometr
Annotation in Czech
Vláknová optická zpožďovací linka s rozlišením lepším jak 1 femtosekunda, rozsahem větším jak 166 pikosekund a řízením pomocí DIO a ethernet vhodném pro průmyslové prostředí.
Scientific branches
R&D category
VV - Exeperimental development
OECD FORD - main branch
10306 - Optics (including laser optics and quantum optics)
OECD FORD - secondary branch
20201 - Electrical and electronic engineering
OECD FORD - another secondary branch
20301 - Mechanical engineering
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
BH - Optics, masers and lasers<br>JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation<br>JR - Other machinery industry<br>JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The project succeeded according to the assignment, the goals were met and all planned results were achieved with expected or better parameters. From a professional point of view, the project was solved with high quality and the main result is applicable on the market. The final report openly and in detail describes the personnel and technological problems that occurred during the solution and the methods of their elimination. The quality of the final report is reduced by a very minimalist and insufficient plan for the implementation of the results and the absence of a specific outlook for their commercial application.
Solution timeline
Realization period - beginning
Jan 1, 2022
Realization period - end
Jun 30, 2024
Project status
U - Finished project
Latest support payment
Feb 28, 2024
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP25-TA0-FW-U
Data delivery date
Jun 20, 2025
Finance
Total approved costs
15,556 thou. CZK
Public financial support
11,715 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
3,875 thou. CZK