All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

New generation carbon lamellas with enhanced fire resistance to reinforce existing structures

Project goals

The aim of the project is to introduce a system of highly resistant lamellas providing different levels of fire protection into practice, thereby increasing the resilience of the existing infrastructure and ensuring the protection of life and health of people while maintaining the existing performance of the building. The current lamellas have zero fire resistance. The project's solution lies in increasing the fire resistance and ensuring that the glued lamellas are highly resistant to high temperatures using advanced materials. The commercial potential of this solution is that the design space is not reduced by protective structures such as ceilings etc. and the fire resistance is provided by the lamella itself.

Keywords

Lamelafire resistanceconstructioncritical infrastructurebuilding objectsreinforcement of building structuresmaterial savingintroduction into practicecompetitive advantage

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    STA02023FW060

  • Main participants

    SYNPO, akciová společnost

  • Contest type

    VS - Public tender

  • Contract ID

    FW06010142 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Systém uhlíkových lamel nové generace se zvýšenou požární odolností pro zesilování stávajících konstrukcí

  • Annotation in Czech

    Cílem projektu je zavedení systému vysoce odolných lamel poskytujících různou úroveň protipožární ochrany do praxe a tím zvýšit odolnost stávající infrastruktury a zabezpečit ochranu života a zdraví osob při zachování stávajících užitných vlastností stavebního objektu. Současné lamely mají nulovou požární odolnost. Řešením projektu je zvýšení požární odolnosti a zajištění vysoké odolnosti lepených lamel vůči vysokým teplotám pomocí pokročilých materiálů. Komerční potenciál má toto řešení z důvodu, že není snižován konstrukční prostor ochrannými konstrukcemi, jako jsou například podhledy apod, a protipožární odolnost je zabezpečena samotnou lamelou, resp. lamelou s protipožárním vrstvou, ochrannou omítkou nebo stěrkou.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    20102 - Construction engineering, Municipal and structural engineering

  • OECD FORD - secondary branch

    20101 - Civil engineering

  • OECD FORD - another secondary branch

    20501 - Materials engineering

  • GB - Agricultural machines and construction
    JG - Metallurgy, metal materials
    JM - Structural engineering
    JN - Civil engineering
    JP - Industrial processes and processing

Solution timeline

  • Realization period - beginning

    Jan 1, 2023

  • Realization period - end

    Dec 31, 2026

  • Project status

    B - Running multi-year project

  • Latest support payment

    Feb 28, 2024

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP25-TA0-FW-R

  • Data delivery date

    Feb 20, 2025

Finance

  • Total approved costs

    21,000 thou. CZK

  • Public financial support

    14,671 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,330 thou. CZK

Basic information

Recognised costs

21 000 CZK thou.

Public support

14 671 CZK thou.

69%


Provider

Technology Agency of the Czech Republic

OECD FORD

Construction engineering, Municipal and structural engineering

Solution period

01. 01. 2023 - 31. 12. 2026